01 intro skenario
DESCRIPTION
skenarioTRANSCRIPT
syamsul irham, Pengelolaan Lapangan, Introduction 1
KEGIATAN SEKTOR MIGAS
UPSTREAM ACTIVITIES
1. Exploration
2. Exploitation
DOWNSTREAM ACTIVITIES
1. Processing
2. Transportation
3. Storage
4. Trading
III: Oil Refining
http://science.howstuffworks.com/oil-drilling1.htm
syamsul irham, Pengelolaan Lapangan, Introduction 2
Development & Production Scenario
Economic Limit
WMP-008 (B1)WMP-008 (B1)WMP-004 STWMP-004 ST
WMP-002 STWMP-002 ST
WMP-007 (A1)WMP-007 (A1)
HP ; MP ; LP SEPARATOR
PRODHEADER
HP WELLS
GAS SALES
MP GAS TO SP-TIKA
HP ; MP ; LP SEPARATOR
PRODHEADER
HP WELLS
GAS SALES
MP GAS TO SP-TIKA
CONVENTIONAL COMPL.SINGLE L STRING
MULTILAYER COMPL.SINGLE STRING
MULTILAYER COMPL.DUAL STRING
Economic Analysis
YES / NO / MAY BE LATER
PENEMUAN PENEMUAN HYDROCARBONHYDROCARBON
KEGIATAN HULU MIGAS
• Kegiatan yg dinamis & penuh risiko
• Pengusahaan padat modal & teknologi
• Setiap kegiatan harus memenuhi kriteria : dapat dilakukan, aman, legal, dan menguntungkan.
syamsul irham, Pengelolaan Lapangan, Introduction 3
Oil and Gas Field Life Cycle
Prospect Definition
Discovery
Appraisal
Development Planning
DevelopmentProduction
Ongoing Development
Depletion
Abandonment
PENGELOLAAN LAPANGAN (FIELD PENGELOLAAN LAPANGAN (FIELD MANAGEMENT):MANAGEMENT):
Membuat suatu perencanaan Membuat suatu perencanaan pengembangan lapangan migas, pengembangan lapangan migas, termasuk penyelenggaraan data, termasuk penyelenggaraan data, rencana kerja yang terkait, anggaran, rencana kerja yang terkait, anggaran, rencana operasi sampai dengan rencana operasi sampai dengan keekonomian . keekonomian .
POD/POFDPOD/POFD
Ref: Kursus pelatihan POD TM-ITB 2003 & “Integrated Petroleum Reservoir Management”, A.Sater & Ganesh C.Thakur
Ref: Kursus pelatihan POD TM-ITB 2003 & “Integrated Petroleum Reservoir Management”, A.Sater & Ganesh C.Thakur
GEOPHYSICS
GEOLOGY
RESERVOIR EVALUATION
PRODUCTION/PROCESSING
ECONOMICS
MANAGEMENT
MAPS, IN PLACE HYDROCARBON
RATE & CHARAC. OF PROD., RESERVE
LIQUID & GAS PROD., COST OF INVESTMENT,
OP.COST
MEASURES OF PROFIT, REPORT
SUMMARY
YES / NO / MAY BE LATER
POD/POFDPOD/POFD
Management
Reservoir Management
Team
Production and Operation Engineering
Drilling Engineering
Design & Construction Engineering
Science
Reseach & Development
Gas & Chemical Engineering
Environtment
Reservoir Engineering
Economics
Geology and Geophysics
Legal
Land
Reservoir Management Team (Copyright@ 1992, SPE, From Paper 22350)
POD/POFDPOD/POFD
Ref: “Integrated Petroleum Reservoir Management”, Satter.A, Ganesh.T
Reservoir Management : as the judicious use of Reservoir Management : as the judicious use of various means available to a businessmanvarious means available to a businessmanIn order to In order to maximize his benefits (profits)maximize his benefits (profits) from a from a reservoir. reservoir.
POD/POFDPOD/POFD
syamsul irham, Pengelolaan Lapangan, Introduction 8
PENGELOLAAN LAPANGAN MIGAS
Pengelolaan usaha-usahaMenemukan dan Memproduksi cadangan migas secara optimal, dengan Teknologi dan Sumber Daya Manusia yang tersedia, memperhatikan aspek Ekonomi, HSE & Community development, dan Peraturan / Perundang-undangan yang berlaku, sehingga Menguntungkan bagi Rakyat, Pengusaha dan Negara.
Basic Pengetahuan Yg Harus Dimiliki
Konsep Nilai Waktu dari Uang, Interest, Discount Factor
Cash Flow Kriteria /Parameter /Indikator Keuntungan
POT NPV @ i PIR /DPIR IRR
Depresiasi Kapital Straight Line Decline Balance Sum of the Year Digits
syamsul irham, Pengelolaan Lapangan, Introduction 9
YOUR GOAL ?????
syamsul irham, Pengelolaan Lapangan, Introduction 10
Your Goal ???They give you long-term vision and short-
term motivation.
An athlete always focus to be the fastest, the first who cross the finish line to be the winner
Business people have set their goals to earn much rewards for their companies.
Set and Reach The Goals
syamsul irham, Pengelolaan Lapangan, Introduction 17
TUGAS-1 : Kondisi Terkini Industri Migas Nasional1. Dibuat /orang 2. Akses dari berbagai sumber yang yang tersedia.3. Eksplorasi, Cadangan, Produksi, Cost, Oil Price,
Gas Price, Kontrak Bagi Hasil, Teknologi, Human Resources, HSE case, dll.
4. Buat komentar pribadi saudara terhadap point-3. FORMAT : SOFT COPY, MICROSOT POWER POINT.
5. DISERAHKAN PALING LAMBAT JUMAT 04 Maret 2011, JAM 11.00 ke : [email protected]